When wind power is connected to a booster station, the following key issues need to be considered:
1. Transmission capacity and system capacity: Ensure that the booster station has sufficient transmission capacity and system capacity to accommodate the electricity generated by wind power generation. This includes considering factors such as the installed capacity of wind turbines, the number of generators, and the expected power generation to ensure that the booster station can stably and effectively accept and transmit electricity.
2. Transmission Line Planning: Plan and design transmission lines to connect wind turbines with booster stations. This includes determining the length of the line, voltage level, wire cable type (underground or overhead), line direction, and laying method. Considering that wind power generation is usually distributed in discrete areas, it is necessary to plan transmission lines reasonably to minimize transmission losses and reduce environmental impacts.
3. Stability of Electric power transmission: ensure the stability of the booster station and Electric power transmission to meet the changing and intermittent characteristics of wind power generation. The output of wind power generation is affected by wind speed, so the booster station needs to have corresponding regulation and control capabilities to ensure the stable operation of the system and adapt to the fluctuations of wind power generation.
4. Power quality: Ensure that the power quality of wind power connected to the booster station meets the specified standards and requirements. This includes voltage stability, frequency control, harmonic and power factor regulation, etc. By using power regulation equipment and reasonable control strategies, it can be ensured that the integration of wind power generation will not have a negative impact on the quality of the entire power system.
5. Operation and Maintenance: Establish a reasonable operation and maintenance plan to ensure the normal operation of the booster station and transmission equipment. Regularly inspect and maintain equipment, promptly identify and address potential faults and issues. In addition, establish an effective monitoring system and remote monitoring capability to timely obtain the operational status and fault information of wind power generation, improve response ability and reliability.
In summary, the integration of wind power into booster stations requires comprehensive consideration of key issues such as transmission capacity, system capacity, transmission line planning, stability, power quality, and operation and maintenance to ensure the reliable integration and effective operation of wind power.
Please contact us for a total package solution for your onshore & offshore wind farms.